|
|
TM 11-5815-238-20
CHAPTER 2
MAINTENANCE INSTRUCTIONS
PAGE
Assembly .....................................................................................................................................
Connections:
Ground and power .................................................................................................................
Installation ....................................................................................................................................
Maintenance procedures ..............................................................................................................
Preparation for storage and shipment ...........................................................................................
PMCS table ..................................................................................................................................
Service upon receipt ....................................................................................................................
Signal circuit connections.
for TT-76(*)IGGC . ................................................................................................................
for TT-699(*)/GGC .................................................................................................................
Unpacking ....................................................................................................................................
Section I. REPAIR PARTS, SPECIAL TOOLS AND SUPPORT EQUIPMENT
2-1. TOOLS AND TEST EQUIPMENT
Tools and test equipment for Organizational Maintenance of ANIGGC-3(*) and AN/GGC-53(*) are listed in the
Maintenance Allocation Chart (MAC) in Appendix B of this manual.
2-2. SPECIAL TOOLS, TMDE AND SUPPORT EQUIPMENT
There are no special tools or TMDE required for this equipment.
2-3. REPAIR PARTS
Repair parts are listed and illustrated in the Repair Parts and Special Tools List TM 11-5815-238-20P covering
Organizational Maintenance for this equipment.
Section II. SERVICE UPON RECEIPT
2-4. UNPACKING EQUIPMENT
Prevent personal injury when removing steel straps by wearing heavy gloves and protective
eyewear. Do not handle shipping container by the steel straps.
CAUTION
When unpacking equipment, do not push tools inside the shipping container, as equipment may be
damaged.
2-1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |