Click here to make tpub.com your Home Page

Page Title: TABLE 2-1. MONTHLY PMCS TABLE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-5815-238-20
TABLE 2-1. MONTHLY PMCS TABLE
ITEM
ITEM
TO BE
NO.
INSPECTED
PROCEDURES
1
Tape perforations
Check tape perforations for tearing, clean punching and drif-
ting. Punched feed holes in the message tape should be
spaced evenly, 10 holes per inch. Use tape gauge in Tool Kit
TE-50B to check this requirement. If incorrect. higher
category of maintenance is required.
2
Lubrication
Check to see that lubrication of steel mounting screws (in
aluminum or magnesium castings), and felt washers located on
keyboard shaft, selector cam shaft, function shaft and
transmitter-distributor shaft have been performed according to
schedule established by local standard operating procedures.
3
Publications
Check DA Pam 310-1 for new publications and new applicable MWO's.
DA Pam 310-7 for any new applicable MWO's.
NOTE
Operational checks are to be conducted in accordance with local
command Standard Operating Procedures (SOP).
4
Operational
Check the AN/GGC-3(*), ANIGGC-53(*), TT-76(*)/GGC, or
Check
TT-699(*)IGGC by operating it (refer to TM 11-5815-238-10).
NOTE
Check to insure that operator maintenance has been performed.
2-17

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business