|
|
TM 11-5815-238-20
TABLE 2-1. MONTHLY PMCS TABLE
ITEM
ITEM
TO BE
NO.
INSPECTED
PROCEDURES
1
Tape perforations
Check tape perforations for tearing, clean punching and drif-
ting. Punched feed holes in the message tape should be
spaced evenly, 10 holes per inch. Use tape gauge in Tool Kit
TE-50B to check this requirement. If incorrect. higher
category of maintenance is required.
2
Lubrication
Check to see that lubrication of steel mounting screws (in
aluminum or magnesium castings), and felt washers located on
keyboard shaft, selector cam shaft, function shaft and
transmitter-distributor shaft have been performed according to
schedule established by local standard operating procedures.
See paragraph 2-21.
3
Publications
Check DA Pam 310-1 for new publications and new applicable MWO's.
DA Pam 310-7 for any new applicable MWO's.
NOTE
Operational checks are to be conducted in accordance with local
command Standard Operating Procedures (SOP).
4
Operational
Check the AN/GGC-3(*), ANIGGC-53(*), TT-76(*)/GGC, or
Check
TT-699(*)IGGC by operating it (refer to TM 11-5815-238-10).
NOTE
Check to insure that operator maintenance has been performed.
2-17
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |