|
|
TM 11-7025-217-30
7. Remove two screws (11) and two flatwashers (12).
8. Holding roller (13), push bearings (14) out of roller frame (15) and remove roller (13).
INSTALLING SPRING LOADED ROLLER ASSEMBLY
2-45.
Aline roller (1) inside roller
1.
frame (2).
A line bearings (3) at each
2.
end of roller ( 1 ) and press
bearings into roller frame (2).
NOTE
Do not overtighten screws.
Roller must be able to
spin freely.
Install two screws (4) and
3.
two flatwashers (5).
USE OR DISCLOSURE OF THIS DATA IS SUBJECT TO THE RESTRICTION ON PAGE D OF THIS DOCUMENT.
2-85
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |