|
|
TM 11-5815-238-20
INDEX
PAGE
PAGE
M
A
Maintenance procedures
2-29
Assembly
2-5
Major components, location
1-2
C
N
Checking unpacked equipment
2-4
Neutral operation
2-9
Cleaning
2-30
Nomenclature cross-reference list
1-2
Components:
Assembly
2-5
O
List
1-2
Connections:
One-way operation
2-12
Ground and power
2-6
Cross-reference list, nomenclature
1-2
P
D
Painting
2-30
Polar operation
2-10
Data and description, equipment
1-2
Preparation for storage and shipment
2-32
Destruction of Army materiel
1-2
Preventive maintenance checks and services
Differences between models
1-3
(PMCS):
Duplex operation
2-11
Table
2-17
Tools required
2-15
E
Principles of operation, technical
1-3
Purpose of equipment
1-1
Equipment:
Data and description
1-2
R
Disassembly
2-32
Records, reports, forms
1-2
F
Repair parts, special tools
2-1
Reports, forms, records
1-2
Forms, records, reports
1-2
S
H
Scope
1-1
Half duplex and send only
2-12
Send only and local preparation of tape
2-12
Half duplex operation
2-12
Signal circuit-connections:
for TT-76(*)/GGC
2-10
for TT-699(*)/GGC
2-15
Inspection
2-18
T
Installation
2-5
Technical principles of operation
1-3
L
Testing
2-30
Troubleshooting:
List, components
1-2
Table
2-20
Local test circuit
2-19
Types of storage
2-32
Location, major components
1-2
Lubrication
2-30
U
Unpacking
2-1
Index-1/(Index-2 blank)
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |