|
|
TM 11-5815-238-20
Carefully lift corrugated box from wooden shipping box.
Remove technical manuals and open corrugated box.
Remove folded corrugated top liner.
Carefully cut sealed barrier; remove equipment from box.
Remove nuts and washers securing equipment to wooden shipping base.
For TT-76A, B, C/GGC, cut tape securing chad bin accessory pack to transmitter distributor.
Remove contents of tape storage bin kit, chad bin accessory pack and folded corrugated end liners.
For TT-761GGC, save wooden shipping base to use as a template for drilling mounting holes.
2-5. CHECKING UNPACKED EQUIPMENT
Inspect equipment for any damage done during shipment. Report any damage on SF 364, Packaging Improvement
Report.
Compare equipment with the packing list to be sure it is complete. Report any differences according to instructions
in TM 38-750.
Check equipment near nomenclature plate for any Modification Work Order (MWO) numbers. They will appear
ONLY if the equipment has been used or reconditioned. Current MWO's which apply to AN/GGC-3(*) or AN/GGC-
53(*) are listed in DA Pam 310-1. Apply all URGENT MWO's. Schedule all NORMAL MWO's.
2-4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |